Sprint 5 close component · contributes 0.050 to the headline confidence right now · -25d to S5 close · -30d to S6 deadline
BINARY — same gating signal as sprint_6_candidates. Score is 1.00 if a `Documents/Sprint 6 Candidates*.md` file exists, else 0.00. 5% weight. The premise: items that won't ship in Sprint 5 must land in the Sprint 6 source so they're not lost.
Tied to the same 2026-05-05 deadline as sprint_6_candidates — fixing one fixes both. Combined they're 15% of the rubric. 40 currently-slipping tasks are auto-included in the draft the helper generates.
slip-cleanup in place
70 tasks at risk of slipping past Sprint 5 close — 70 total slipping; showing top 15 by priority.
+ more — see /projects/queue
← back to Sprint 5 detail ·
component key: slip_clean