Sprint 5 close component · contributes 0.350 to the headline confidence right now · -25d to S5 close · -30d to S6 deadline
9 named must-ship tasks for Sprint 5 close (per Section 1 of sprint-5-close-criteria.md). Score is fraction with status 'done' or 'shipped' in project_tasks. This is the largest rubric weight at 35% — by far the biggest mover of the headline confidence.
Sprint 5 close target 2026-05-10. With this at 0.00 and 35% weight, the headline cannot exceed 0.65 even if every other component is perfect. Ship one required task → headline jumps ~0.04. Three → ~0.12.
6 of 6 required tasks shipped/done
9 required tasks for Sprint 5 close — 9 of 9 done · 0 in-flight · 1 awaiting