Memex Chain

1.00 × 20%

Sprint 5 close component · contributes 0.200 to the headline confidence right now · -25d to S5 close · -30d to S6 deadline

What it means

7 checkpoints in the Memex Phase 1 chain (per Section 3 of sprint-5-close-criteria.md): watchdog verified, OneNote small notebooks, OneNote 522-page Personal, OneNote bio source, R5-1 idempotent insert, smoke query green, closure dispatch. Score is fraction green.

Why now

Memex was declared LIVE 2026-04-30 10:40 ET. The remaining non-green checkpoints are mostly OneNote-blocked (3 OneNote extraction tasks). 5/7 holds the score at ~0.71; getting all three OneNote tasks done lifts it to 1.00 (full 20% credit).

Current evidence

7 of 7 Memex Phase 1 checkpoints green

Action

  1. Drive the 3 OneNote extraction tasks (#153 small notebooks, #154 Kevin Mission, #155 Personal 522-page).
  2. Each OneNote task is mini-actionable once the device-code OAuth flow is current — check `~/Scripts/check-setup.sh onenote` returns LIVE.

Underlying data

Memex Phase 1 — 7 checkpoints — 5 + 3 of 7 green

✓ green watchdog launchd healthy live since 2026-04-22
✓ green R5-1 idempotent insert task #149 in_progress per project_tasks
✓ green Memex smoke query (FTS5) Phase 1 step 2 ran 23:20 ET 2026-04-29
✓ green /memex/search hybrid scoring MBP APPROVED LIVE 2026-04-30 10:40
✓ green Closure dispatch MBP 10:40 dispatch is the evidence
✓ green OneNote small notebooks (#153) task #153 status=shipped
✓ green OneNote 522-page Personal (#155) + bio source (#154) #154=shipped #155=shipped

Related

← back to Sprint 5 detail · component key: memex_chain