Sprint 5 close component · contributes 0.200 to the headline confidence right now · -25d to S5 close · -30d to S6 deadline
7 checkpoints in the Memex Phase 1 chain (per Section 3 of sprint-5-close-criteria.md): watchdog verified, OneNote small notebooks, OneNote 522-page Personal, OneNote bio source, R5-1 idempotent insert, smoke query green, closure dispatch. Score is fraction green.
Memex was declared LIVE 2026-04-30 10:40 ET. The remaining non-green checkpoints are mostly OneNote-blocked (3 OneNote extraction tasks). 5/7 holds the score at ~0.71; getting all three OneNote tasks done lifts it to 1.00 (full 20% credit).
7 of 7 Memex Phase 1 checkpoints green
Memex Phase 1 — 7 checkpoints — 5 + 3 of 7 green
← back to Sprint 5 detail ·
component key: memex_chain